Michigan State Univerity, Brody Hall Renovation

East Lansing, Michigan

Architectural

Story

Design Plus was hired in 2006 to provide complete architectural and engineering services for the 120,000 SF renovation of Brody Hall. The renovations include all major mechanical, electrical, ventilation system upgrades and replacement as well as the addition of enhanced life safety systems, ADA code required modifications, elevator renovations, asbestos abatement, lighting upgrades, flooring and ceiling replacement, roofing and exterior restoration, office, food service, and dining modifications, and other related improvements. During the renovations, Brody Hall will remain available to serve the needs of the students including dining services, classrooms, academic and business functions. Construction will be completed during the summer months between 2009 and 2011. Construction costs are estimated at $30,000,000.

Facts

  • Title: Michigan state univerity, brody hall renovation
  • Location: East lansing, michigan
  • Phase: Complete
  • Budget: $30,000,000
  • Size: 120000.0


Project Identification Number:

PP-CST-2B5A-F549-B548-C02F-0


Status: Completed


Tags

  • hospitality
  • clubshospitality
  • collegeuniversity


@Mentions:

Design Plus

Architectural


Worked on this project?

Add it to your portfolio