Grand Rapids, Michigan
Deck-Coating
Grand Rapids Parking Ramp An aggressive 16-month schedule required construction to continue through the winter of 1996-1997. This parking ramp was designed to blend with the upscale décor of the surrounding downtown buildings. Features • Total parking spaces – 811 • Offices for Grand Rapids Parking Services • Post-tensioned concrete framework • 2.5 miles of auger cast piling, extending to bedrock • Architectural pre-cast concrete exterior
PP-CST-690F-F185-A8A2-5D57-1
Status: Completed