Harvest Bible Chapel - Spring Lake :: Renovation and addition

Spring Lake, Michigan

Engineering

Story

This recently remodeled church was, at one time, strictly warehouse space. To complete this project, 12,842 sq. ft. was renovated into Chapel space while 12,805 sq. ft. was renovated into education space.

In order to complete the new chapel and education space, DVCC completely removed the roof structure, inset steel columns and steel roof trusses within the existing warehouse walls.

Various features of the space include polished, concrete floors throughout the chapel space, an exposed metal roof deck complete with K-13 acoustical material in the chapel, six inch rigid poly roof insulation and a new fire wall to separate different groups’ usage.

Classic Engineering provided the Structural and HVAC Engineering on the project.  

Facts

  • Title: Harvest bible chapel - spring lake
  • Subtitle: Renovation and addition
  • Location: Spring lake, michigan
  • Postal code: 49546
  • Phase: Complete
  • Delivery method: Design-build
  • Size: 25647.0


Project Identification Number:

PP-CST-E5CA-D404-AAB6-A2ED-1


Status: Completed


Tags

  • churches
  • hvac-engineering
  • structural-engineering
  • Church