Carlson Studio Architecture

Sarasota, Florida

Carlson Studio Architecture Offices

Sarasota, Florida

Architectural

Story

            Carlson Studio Architecture purchased a 1930's grocery store in the heart of downtown Sarasota and converted it into its new headquarters. The interior build out has been awarded LEED Silver Certification in the LEED-CI program of the USGBC.

            The design achieved a 47% reduction in water use by incorporating low flow fixtures, dual flush toilets and motion sensors on lavatory faucets. Use of energy efficient fluorescent lighting with direct/indirect light and lighting occupancy sensors resulted in a 28% reduction in lighting energy use.

            Other sustainable features include adding windows for natural daylighting; exclusive use of environmentally friendly paints, adhesives, furnishings, cabinets and flooring; and replacing the roof with additional insulation and an Energy Star rated single ply reflective membrane roof system.

Green Features:

  • Improve the building envelope for thermal comfort and operational savings
  • Reduce water consumption
  • Reduce energy consumption
  • Provide natural daylight and views to the exterior
  • Minimize indoor pollutants through exclusive use of environmentally friendly paints, adhesives, furnishings, cabinets, and flooring.
  • Improve productivity of occupants. Adaptive reuse of the existing building saved carbon emissions, land fill waste and energy.
  • Located within 2 blocks of a main public transit hub
  • 47% reduction in water use
  • 28% reduction in lighting energy use
  • Adding windows increased access to day lighting and exterior views. Using double pane, impact resistant, and Low E tinted glazing reduced solar heat gain.
  • Replacing the roof with additional insulation and an Energy Star rated single ply reflective membrane roof system enhanced energy savings.
  • The mechanical systems were replaced with more energy efficient equipment.
  • Energy efficient fluorescent lighting with direct / indirect light was installed throughout the interior.
  • Compact fluorescent light fixtures and occupancy sensors were installed in restrooms and storage rooms.
  • Site lighting for security was minimized to reduce light pollution.
  • Low flow plumbing fixtures, dual flush toilets and motion sensors were installed for water conservation.

 

 

 

 

Facts

  • Title: Carlson studio architecture offices
  • Location: Sarasota, florida
  • Postal code: 34236
  • Phase: Complete
  • Green: Leed silver
  • Delivery method: Design-bid-build
  • Budget: $210,000
  • Size: 2400.0


Project Identification Number:

PP-CST-D1DF-B77D-0F93-409D-0


Status: Completed


Tags

  • office


@Mentions:


Worked on this project?

Add it to your portfolio